ARDF Exhibit Installation Photos

  • Install 11
    All six sections placed in order along the exhibit area wall.
  • Install 12
    Adler Display project manager, Andy Davenport, reviews installation plans.
  • Install 13
    The power for the display connects to a junction box hidden inside the digital monitor mounting frame. Andy Davenport connects the wires and remote control on/off switch.
  • Install 14
    All six sections are aligned and secured together with wood screws.
  • Install 15
    There are two floor mounted display cases.  The CAP-72 artifacts will be displayed in the rear case; the EC-47 aircraft model will be placed in the front case.
  • Install 16
    Andy Davenport preparing to install the aircraft model display case.
  • Install 17
    L-R: Nurre, Davenport and Martin install a display graphic.
  • Install 18
    Installing another exhibit graphic.
  • Install 19
    Exhibit construction progress.
  • Install 20
    Davenport installs one of the full length graphics panels.